Projects

Mercury Spill Cleanup

2012 TriMedia was called upon to provide assessment and cleanup associated with a mercury spill at an Upper Peninsula hospital. The spill occurred in a […]

Baseline Air Monitoring

2014 For a leading global surgical implant manufacturer, TriMedia performed indoor air monitoring at locations within the facility to evaluate potential personnel exposure. Sampling equipment […]

River Recovery Project

2007 The failure of a dam resulted in major destruction along a mile and a half channel of a river in Michigan’s upper penninsula. Trimedia […]

Airport Runway Resurfacing Survey

Upper Peninsula, Michigan 2014 An upper penninsula airport completed a $3.5 million runway resurfacing project during the summer of 2014. The runway, which had been […]

Hospital Construction Survey

Upper Michigan 2011 TriMedia provided construction staking services for a hospital site in upper Michigan. Preconstruction activities consisted of horizontal alignment information, verifying/densifying horizontal and […]

Construction Safety Oversight

Upper Peninsula, Michigan 2010 – present As part of a long-term construction process, TriMedia was initially brought on in 2010 by a large mining company […]

Asbestos Containing Building Materials & Lead Paint Surveys

Upper Michigan 2003 In 2003, a forestry service turned to TriMedia to complete ACBM and lead-based paint surveys for 24 Forest Service Buildings. The ACBM […]

Phase I ESA and Asbestos Surveys

Eastern Michigan 2005 TriMedia was retained to conduct a Phase I Environmental Site Assessment (Phase I ESA) and Asbestos Surveys for two commercial properties and […]

Correctional Facility Demolition

Upper Peninsula, Michigan 2013 A correctional facility in Michigan’s Upper Peninsula evaluated some of their buildings and ultimately made the decision to demolish some that […]