River Recovery Project

About this Project

Dam failure caused major destruction along a 1.5 mile channel.

To assist with the recovery, we provided construction staking for the complete reconstruction of the river channel along with adjacent wetlands and upland areas.

Our team team also provided design services to revise vertical and horizontal alignments to match existing conditions, as well as as-built surveys to verify channel construction.

Contact Us

Headquarters

830 W Washington St
Marquette, MI 49855

Offices in Michigan, Wisconsin, Montana, Arizona, and Nebraska

(906) 228-5125

hello@trimediaee.com

Robert Lehto – President

Tom Anthos – Vice President